EVO 2.0 S

THE NEW GENERATION OF
UNCOMPROMISING
FLAT ROOF MOUNTING SYSTEM

The intelligent revolutionization of the entire construction results in previously unattained performance in safety and quality. The EVO 2.0 still counts on an extremely short time of assembly, highest safety standards and an unbeatable quality combined with a 10-years PMT insurance cover. And finally, all that at a significant price cut.

Let convince yourself by characteristics like:

  • Time of assembly
    up to 15 kWp per worker/hour
  • Insurance cover
    10-years protection cover included for every project
  • Optimization of ballast
    Reduction of ballast up to 50% in comparison to the EVOlution

PRODUCT CHARACTERISTICS

Ballast optimized

  • Improved aerodynamics and system stabilitys
  • Verification through WTG wind tunnel certificate
  • Optional: ballast trough, ridge bracket, side cover, ballast fixing

Module assembly guidelines

  • Compliance with modular clamping ranges
  • Module drainage kept free
  • Optional: low-resistance module earthing

Click technology

  • Non-interchangeable click connectors
  • Measuring-free and reversible assembly
  • One tool sufficient for system assembly
  • No caterpillar effect up to 5° roof inclination

Ideal cable routing

  • 3-fold edge-clips holder
  • Separate laying DC+/-
  • Seperation distances +150 mm possible
  • Integrated cable duct cover
  • Optional: Routes connection

Maximum safety

  • WTG interface layer wind tunnel test
  • NTA of the total system: Z-14.4-790
  • Certification according to UL2703 applied
  • Lightning current carrying capability according to DIN EN 62561-1
  • European Technical Assessment (ETA) applied
  • Optional: Lightning protector, PMT PROOF

PV-module suitability

  • Suitable for all 60 and 72 cell modules
  • Module lengths 1570 – 2005 mm
  • Module widths 960 – 1050 mm


Integrated Fall protection

  • Circumferential safety rope system
  • Certified according to DIN EN 795:2012
    and CEN/TS 16415:2013
  • Safety rope system secures up to 3 persons of 100 kg each

Universal module clamp

  • Universal clamp from 30 to 50 mm module height
  • Removable and reusable

Optimum contact surface

  • Continuous floor rail of 115 mm in width
  • Integrated high-tech protective mat
  • Roof drainage guaranteed
  • No plasticiser migration
  • Optional: variable maintenance corridor

Extensive accessoires

  • Inverted convertor bank
  • Different roof connections
  • Integration lightning protection
  • Beam transmitter connection

EVO 2.0 AEBP Type 75
EVO 2.0 V3BP Type 367
EH AK II Klick 30-50 l=40 k
EVO 2.0 QBS Type 1648
EVO 2.0 KD Type 700
EVO 2.0 KD Type 530
EVO 2.0 HBP10 Type 1467
AL universal
EVO 2.0 RW10 Type 1800
MH AK II Klick 30-50 k
EVO 2.0 V1BP Type 127
EVO 2.0 T10 Type 75
EVO 2.0 RWT Type 75
EVO 2.0 QSV Type 390
EVO 2.0 QSVU Type 1180

Safety precaution against fall
Assembly ballast trough
Ridge coupling
Side cover
Adaptor trapeze plate
Cable ducts

Application
  • Flat roof up to 5° (special design on request)
Setting angle
  • 10° and 15°
Orientation
  • South
Roof cladding
  • Foil, bitumen, gravel, planting, sheet metal, concrete, open space
Module system dimension
  • 1500mm
  • 1650mm
Material
  • Aluminium EN-AW-6063-T3
  • Stainless steel A2-70
Weight
  • Only 4,32kg per modular unit
  • Double modular unit from 0,96kg/m² on
High-Tech protective mat
  • 11mm thick high-tech protective mat with antislip coating
  • No plasticiser migration
  • Pre-assembled at the mounting system
Approvals
  • Lightning current carrying system according to
    DIN EN 62561 (VDE 185-561-1):2013-02
  • National Technical Approval Z-14.4-790 for the aerodynamical flat roof system
  • Certificate according to UL2703 for the US-market
PV-component application
  • All common PV modules sizes
    Width: 960-1050mm
    Length: 1570-2005mm
    Höhe: 30-50mm

The time of delivery normally is 10 to 14 days.

Yes, our high-tech protection mat is already pre-mounted on all our flat roof mounting systems and the Flat Direct.

Our high-tech protective mat is made of polyethylene. This material cannot absorb migrating plasticisers from the roof cladding, i.e. an aluminium coating is not necessary.

For the pure mounting system with ballasting a mechanic needs about 1 h for 10 kWp. This corresponds to 35 modules.

In our project report you will find all data regarding the project, as data of the building, data regarding wind and snow load zone, component data and data of the mounting system, including ballasting scheme, rail plan and all load weight and ballast parameters.

Our mounting system is finished of high-grade aluminium and stainless steel. The high-tech protective mat is made of polyethylene.

Normally, the ballast weights are installed on the main ground rail. Should the weight however, according to the ballast weights, exceed 60 kg/ 74 kg per double module, 2 crossbraces will be assembled additonally under the double module.

Our warranty period is 10 years on all our products. Further details can be seen in our Warranty Conditions.

The insurance cover comprises primary and secondary damages and ceases to be in force whenever Premium Mounting Technologies has made a mistake in planning, mounting or measuring of the system. Primary and secondary damages are all damages concerning directly the system, the building or the surrounding.

Components

EVO 2.0 AEBP Type 75
EVO 2.0 V3BP Type 367
EH AK II Klick 30-50 l=40 k
EVO 2.0 QBS Type 1648
EVO 2.0 KD Type 700
EVO 2.0 KD Type 530
EVO 2.0 HBP10 Type 1467
AL universal
EVO 2.0 RW10 Type 1800
MH AK II Klick 30-50 k
EVO 2.0 V1BP Type 127
EVO 2.0 T10 Type 75
EVO 2.0 RWT Type 75
EVO 2.0 QSV Type 390
EVO 2.0 QSVU Type 1180

Accessoires

Safety precaution against fall
Assembly ballast trough
Ridge coupling
Side cover
Adaptor trapeze plate
Cable ducts

Technical Data

Application
  • Flat roof up to 5° (special design on request)
Setting angle
  • 10° and 15°
Orientation
  • South
Roof cladding
  • Foil, bitumen, gravel, planting, sheet metal, concrete, open space
Module system dimension
  • 1500mm
  • 1650mm
Material
  • Aluminium EN-AW-6063-T3
  • Stainless steel A2-70
Weight
  • Only 4,32kg per modular unit
  • Double modular unit from 0,96kg/m² on
High-Tech protective mat
  • 11mm thick high-tech protective mat with antislip coating
  • No plasticiser migration
  • Pre-assembled at the mounting system
Approvals
  • Lightning current carrying system according to
    DIN EN 62561 (VDE 185-561-1):2013-02
  • National Technical Approval Z-14.4-790 for the aerodynamical flat roof system
  • Certificate according to UL2703 for the US-market
PV-component application
  • All common PV modules sizes
    Width: 960-1050mm
    Length: 1570-2005mm
    Höhe: 30-50mm

Downloads
FAQ

The time of delivery normally is 10 to 14 days.

Yes, our high-tech protection mat is already pre-mounted on all our flat roof mounting systems and the Flat Direct.

Our high-tech protective mat is made of polyethylene. This material cannot absorb migrating plasticisers from the roof cladding, i.e. an aluminium coating is not necessary.

For the pure mounting system with ballasting a mechanic needs about 1 h for 10 kWp. This corresponds to 35 modules.

In our project report you will find all data regarding the project, as data of the building, data regarding wind and snow load zone, component data and data of the mounting system, including ballasting scheme, rail plan and all load weight and ballast parameters.

Our mounting system is finished of high-grade aluminium and stainless steel. The high-tech protective mat is made of polyethylene.

Normally, the ballast weights are installed on the main ground rail. Should the weight however, according to the ballast weights, exceed 60 kg/ 74 kg per double module, 2 crossbraces will be assembled additonally under the double module.

Our warranty period is 10 years on all our products. Further details can be seen in our Warranty Conditions.

The insurance cover comprises primary and secondary damages and ceases to be in force whenever Premium Mounting Technologies has made a mistake in planning, mounting or measuring of the system. Primary and secondary damages are all damages concerning directly the system, the building or the surrounding.

3D Model

News

EVO 2.0

The up to now most powerful PV plant in Poland with impressive 22.947 modules and a total output of 6698 kWp has been connected  at the end of August.

photovoltaik

On flat roofs the piece of work is still done very sloppily. Now PMT inspects and approves the plants themselves. The managing director Peter Grass explains why, and which advantages these additional expenses imply.

PV Magazine Intl.

The solar industry is still debating the extent to which this problem, whereby temperature-related expansions and contractions cause an installed system to move gradually across a rooftop...

RESISTANT & SAFE

110% safety through PMT

Considering the stage of development, the testing procedures and the demands of safety, Premium Mounting Technologies offers the best mounting systems in the whole market.

Continue

Direktkontakt