The up to now most powerful PV plant in Poland with impressive 22.947 modules and a total output of 6698 kWp has been connected at the end of August.
EVO 2.0 S
THE NEW GENERATION OF
UNCOMPROMISING
FLAT ROOF MOUNTING SYSTEM
The intelligent revolutionization of the entire construction results in previously unattained performance in safety and quality. The EVO 2.0 still counts on an extremely short time of assembly, highest safety standards and an unbeatable quality combined with a 10-years PMT insurance cover. And finally, all that at a significant price cut.
Let convince yourself by characteristics like:
- Time of assembly
up to 15 kWp per worker/hour - Insurance cover
10-years protection cover included for every project - Optimization of ballast
Reduction of ballast up to 50% in comparison to the EVOlution
PRODUCT CHARACTERISTICS
Ballast optimized
- Improved aerodynamics and system stabilitys
- Verification through WTG wind tunnel certificate
- Optional: ballast trough, ridge bracket, side cover, ballast fixing
Module assembly guidelines
- Compliance with modular clamping ranges
- Module drainage kept free
- Optional: low-resistance module earthing
Click technology
- Non-interchangeable click connectors
- Measuring-free and reversible assembly
- One tool sufficient for system assembly
- No caterpillar effect up to 5° roof inclination
Ideal cable routing
- 3-fold edge-clips holder
- Separate laying DC+/-
- Seperation distances +150 mm possible
- Integrated cable duct cover
- Optional: Routes connection
Maximum safety
- WTG interface layer wind tunnel test
- NTA of the total system: Z-14.4-790
- Certification according to UL2703 applied
- Lightning current carrying capability according to DIN EN 62561-1
- European Technical Assessment (ETA) applied
- Optional: Lightning protector, PMT PROOF
PV-module suitability
- Suitable for all 60 and 72 cell modules
- Module lengths 1570 – 2005 mm
- Module widths 960 – 1050 mm
Integrated Fall protection
- Circumferential safety rope system
- Certified according to DIN EN 795:2012
and CEN/TS 16415:2013 - Safety rope system secures up to 3 persons of 100 kg each
Universal module clamp
- Universal clamp from 30 to 50 mm module height
- Removable and reusable
Optimum contact surface
- Continuous floor rail of 115 mm in width
- Integrated high-tech protective mat
- Roof drainage guaranteed
- No plasticiser migration
- Optional: variable maintenance corridor
Extensive accessoires
- Inverted convertor bank
- Different roof connections
- Integration lightning protection
- Beam transmitter connection
- Flat roof up to 5° (special design on request)
- 10° and 15°
- South
- Foil, bitumen, gravel, planting, sheet metal, concrete, open space
- 1500mm
- 1650mm
- Aluminium EN-AW-6063-T3
- Stainless steel A2-70
- Only 4,32kg per modular unit
- Double modular unit from 0,96kg/m² on
- 11mm thick high-tech protective mat with antislip coating
- No plasticiser migration
- Pre-assembled at the mounting system
- Lightning current carrying system according to
DIN EN 62561 (VDE 185-561-1):2013-02 - National Technical Approval Z-14.4-790 for the aerodynamical flat roof system
- Certificate according to UL2703 for the US-market
- All common PV modules sizes
Width: 960-1050mm
Length: 1570-2005mm
Höhe: 30-50mm
- » What is the time of delivery of the flat roof mounting systems?
-
The time of delivery normally is 10 to 14 days.
- » Has your high-tech protection mat already been pre-assembled?
-
Yes, our high-tech protection mat is already pre-mounted on all our flat roof mounting systems and the Flat Direct.
- » Why is your high-tech protection mat not coated with aluminium?
-
Our high-tech protective mat is made of polyethylene. This material cannot absorb migrating plasticisers from the roof cladding, i.e. an aluminium coating is not necessary.
- » Which time does it take to assemble the EVO 2.0?
-
For the pure mounting system with ballasting a mechanic needs about 1 h for 10 kWp. This corresponds to 35 modules.
- » What do I find in your project report?
-
In our project report you will find all data regarding the project, as data of the building, data regarding wind and snow load zone, component data and data of the mounting system, including ballasting scheme, rail plan and all load weight and ballast parameters.
- » Which kind of material do you use?
-
Our mounting system is finished of high-grade aluminium and stainless steel. The high-tech protective mat is made of polyethylene.
- » Where are the ballasting points of the EVO-system?
-
Normally, the ballast weights are installed on the main ground rail. Should the weight however, according to the ballast weights, exceed 60 kg/ 74 kg per double module, 2 crossbraces will be assembled additonally under the double module.
- » How long is your warranty period?
-
Our warranty period is 10 years on all our products. Further details can be seen in our Warranty Conditions.
- » What is included in the insurance cover?
-
The insurance cover comprises primary and secondary damages and ceases to be in force whenever Premium Mounting Technologies has made a mistake in planning, mounting or measuring of the system. Primary and secondary damages are all damages concerning directly the system, the building or the surrounding.
- Flat roof up to 5° (special design on request)
- 10° and 15°
- South
- Foil, bitumen, gravel, planting, sheet metal, concrete, open space
- 1500mm
- 1650mm
- Aluminium EN-AW-6063-T3
- Stainless steel A2-70
- Only 4,32kg per modular unit
- Double modular unit from 0,96kg/m² on
- 11mm thick high-tech protective mat with antislip coating
- No plasticiser migration
- Pre-assembled at the mounting system
- Lightning current carrying system according to
DIN EN 62561 (VDE 185-561-1):2013-02 - National Technical Approval Z-14.4-790 for the aerodynamical flat roof system
- Certificate according to UL2703 for the US-market
- All common PV modules sizes
Width: 960-1050mm
Length: 1570-2005mm
Höhe: 30-50mm
- » What is the time of delivery of the flat roof mounting systems?
-
The time of delivery normally is 10 to 14 days.
- » Has your high-tech protection mat already been pre-assembled?
-
Yes, our high-tech protection mat is already pre-mounted on all our flat roof mounting systems and the Flat Direct.
- » Why is your high-tech protection mat not coated with aluminium?
-
Our high-tech protective mat is made of polyethylene. This material cannot absorb migrating plasticisers from the roof cladding, i.e. an aluminium coating is not necessary.
- » Which time does it take to assemble the EVO 2.0?
-
For the pure mounting system with ballasting a mechanic needs about 1 h for 10 kWp. This corresponds to 35 modules.
- » What do I find in your project report?
-
In our project report you will find all data regarding the project, as data of the building, data regarding wind and snow load zone, component data and data of the mounting system, including ballasting scheme, rail plan and all load weight and ballast parameters.
- » Which kind of material do you use?
-
Our mounting system is finished of high-grade aluminium and stainless steel. The high-tech protective mat is made of polyethylene.
- » Where are the ballasting points of the EVO-system?
-
Normally, the ballast weights are installed on the main ground rail. Should the weight however, according to the ballast weights, exceed 60 kg/ 74 kg per double module, 2 crossbraces will be assembled additonally under the double module.
- » How long is your warranty period?
-
Our warranty period is 10 years on all our products. Further details can be seen in our Warranty Conditions.
- » What is included in the insurance cover?
-
The insurance cover comprises primary and secondary damages and ceases to be in force whenever Premium Mounting Technologies has made a mistake in planning, mounting or measuring of the system. Primary and secondary damages are all damages concerning directly the system, the building or the surrounding.
3D Model
News
PMT PROOF
photovoltaik

On flat roofs the piece of work is still done very sloppily. Now PMT inspects and approves the plants themselves. The managing director Peter Grass explains why, and which advantages these additional expenses imply.
Caterpillar
PV Magazine Intl.

The solar industry is still debating the extent to which this problem, whereby temperature-related expansions and contractions cause an installed system to move gradually across a rooftop...